Our House Construction Packages in Bangalore

Explore Our Turnkey House Construction Packages in Bangalore for Your Dream Home. Build Premium House at affordable price with our Complete house construction packages.

SpecificationSTANDARD
β‚Ή1875 /sqft
PRIME
β‚Ή1990 /sqft
LUXURY
β‚Ή2350 /sqft
SUPER LUXURY
β‚Ή3850 /sqft
ARCHITECTURAL CONCEPT DESIGN
2D Proposal Planβœ”βœ”βœ”βœ”
Furniture Layoutβœ”βœ”βœ”βœ”
3D Elevationβœ”βœ”βœ”βœ”
Isometric viewsβ€”β€”βœ”βœ”
Walkthrough Externalβ€”βœ”βœ”βœ”
Walkthrough Internalβ€”β€”βœ”βœ”
VR Experienceβ€”β€”β€”βœ”
Revisions on Design331010
ARCHITECTURAL WORKING DRAWINGS
Brick Work Layoutβœ”βœ”βœ”βœ”
2D Elevation Layoutβœ”βœ”βœ”βœ”
Cross Sectional Layoutβœ”βœ”βœ”βœ”
Door & Window Scheduleβœ”βœ”βœ”βœ”
MEP DRAWINGS
Electrical Drawingβœ”βœ”βœ”βœ”
Plumbing Drawingβœ”βœ”βœ”βœ”
HVAC Drawingβ€”β€”βœ”βœ”
STRUCTURAL DESIGN
Structural Design as per IS Codeβœ”βœ”βœ”βœ”
Good for construction drawingsβœ”βœ”βœ”βœ”
Overlapped Structural,
Architectural & MEP Drawings
βœ”βœ”βœ”βœ”
3D structural drawings &
Design Analysis Report
β€”β€”βœ”βœ”
TESTS
In person site survey on the basis of
measurement provided by client
βœ”βœ”βœ”βœ”
Site survey by surveyor with instruments
& drawing provided by client
β€”βœ”βœ”βœ”
Soil Test Reportβœ”βœ”βœ”βœ”
CIVIL WORKS
Floor to Floor Height in feet1010.510.511
Slab thickness in inchesUpto 6Upto 6Upto 6Upto 6
Column thickness in inchesUpto 8Upto 8Upto 8Upto 9
Steel brandBhuwalka/
Kamadenu/
Equivalent
JSW/
Sail/
Equivalent
JSW/
Tata/
Equivalent
JSW/
Tata/
Equivalent
Steel Grade550 TMT550 TMT550 TMT550 TMT
Steel basic cost upto Rs60000/ton63000/ton69000/ton90000/ton
Cement grade43 or 5343 or 535353
Cement basic cost upto Rs370/bag380/bag400/bag430/bag
Fine aggregate for masonryMsandMsandMsandMsand
Fine aggregate for plasteringDW-PsandDW-PsandDW-PsandTW-Psand
Sump wall thickness in inches8886
Sump wall materialSolid BlockSolid BlockSolid BlockRCC
UG Sump capacity in liters700080001000012000
Concrete grade RMCM20M25M25M25
Wall materialSolid BlockSolid BlockSolid BlockBrick
External wall thickness in inches6669
Internal wall thickness in inches4444.5
External wall water proofingβœ”βœ”βœ”βœ”
Terrace waterproofing based onCementCementCrystallineCrystalline
Concrete Loftsβ€”β€”β€”βœ”
Ledge wallβ€”β€”βœ”βœ”
FLOORING & WALL DADO
Parking floorβ‚Ή 60/SqFtβ‚Ή 60/SqFtβ‚Ή 65/SqFtβ‚Ή 150/SqFt
Foyer floorβ‚Ή 70/SqFtβ‚Ή 80/SqFtβ‚Ή 140/SqFtβ‚Ή 400/SqFt
Living floorβ‚Ή 70/SqFtβ‚Ή 80/SqFtβ‚Ή 400/SqFtβ‚Ή 400/SqFt
Bedroom floorβ‚Ή 70/SqFtβ‚Ή 80/SqFtβ‚Ή 140/SqFtβ‚Ή 400/SqFt
Kitchen floorβ‚Ή 70/SqFtβ‚Ή 80/SqFtβ‚Ή 140/SqFtβ‚Ή 400/SqFt
Kitchen wallβ‚Ή 55/SqFtβ‚Ή 60/SqFtβ‚Ή 65/SqFtβ‚Ή 150/SqFt
Bathroom floorβ‚Ή 60/SqFtβ‚Ή 60/SqFtβ‚Ή 70/SqFtβ‚Ή 150/SqFt
Bathroom wallβ‚Ή 60/SqFtβ‚Ή 60/SqFtβ‚Ή 65/SqFtβ‚Ή 150/SqFt
Balcony floorβ‚Ή 60/SqFtβ‚Ή 60/SqFtβ‚Ή 65/SqFtβ‚Ή 150/SqFt
Staircaseβ‚Ή 100/SqFtβ‚Ή 110/SqFtβ‚Ή 140/SqFtβ‚Ή 400/SqFt
Grouting for floorCementCementCementCement
Grouting for bathroom floorCementCementEpoxyEpoxy
Flooring materialVitrified tileVitrified tile/ Smart marbleVitrified tile/ Smart marble/ Italian marbleVitrified tile/ Smart marble/ Italian marble
ELECTRICAL
Electrical points per 1000 SqFt404550Unlimited
Switches & Plates makeAnchor romaAnchor romaLegrand britzyLegrand touch screen
Wires makeAnchor/Fire proofFinolex/Fire proofHavelles/Fire retardantHavelles/Fire retardant/Smoke proof
Conduits makeVIPVIPVIPVIP
DB & MCB makeSiemens/
Scheinder
Siemens/
Scheinder
ABBABB
Home automationβ€”β€”LimitedUpto Rs 75000
PLUMBING
Fresh water pipe brandAstral/
Supreme/
Equivalent
Astral/
Ashirwad/
Equivalent
Astral/
Ashirwad/
Equivalent
Astral/
Ashirwad/
Equivalent
Waste water pipe brandSupreme/ EquivalentAshirwad/EquivalentAshirwad/EquivalentAshirwad/Equivalent
Inspection chambersSeparateSeparateSeparateSeparate
Hot water line for Sinkβ€”βœ”βœ”βœ”
Ground water rechargeβ€”β€”β€”βœ”
FIXTURES
Kitchen sink & Accessories cost650095001500040000
Kitchen sink & Accessories brandStainless steel/Granite/CarysilStainless steel/Granite/CarysilStainless steel/CarysilStainless steel/Carysil
CP & Sanitary fixtures cost per
1000 SqFt for 2 bathrooms
36000380005000080000
CP & Sanitary fixtures brandJaquar/HindwareJaquar/HindwareJaquar/HindwareGrohe/Kohler
PVC overhead tankGanga/KaveriGanga/KaveriSintex/KaveriSintex/Kaveri
DOORS
Main Door ( Teak frame + Teak shutter )250003000040000100000
Puja Door ( Teak frame + Teak shutter )250003000040000100000
Internal Door ( Sal frame + Flush shutter )9000110001100020000
Bathroom Door
( WPC frame + WPC shutter )
800080001000015000
Door HardwareOzone
Europa
Ozone
Europa
Godrej
Hafele
Godrej
Hafele
Door HingesSS hingesSS hingesSS hingesSS hinges
Cost inclusive of planning, Rebate and transportationβœ”βœ”βœ”βœ”
WINDOWS
Window specificationUPVCUPVCUPVC/WoodUPVC/Wood
Window brandPlast one/ EquivalentPlast one/ EquivalentIesso/ EquivalentAIS/Fenesta/ Equivalent
Window grillMS grillMS grillMS grillMS grill
Basic price per SqFt5505506501800
Doors and windows percentage18202230
FABRICATION
Main gate per SqFt3604004501000
External staircase Per rft7509009001800
Internal staircase Per rft75090011001800
Balcony railing Per rft7509009001800
Utility grill upto 100 SqFt price per SqFtβ€”β€”β€”350
MS ladder budget30005000700015000
PAINTING
Internal paintingβœ”βœ”βœ”βœ”
Putty coat2232
Primer coat1111
Paint coat222 or 32
Internal paintTractor emulsionTractor shine emulsionPremium emulsionRoyal shine
External paintingβœ”βœ”βœ”βœ”
Primer coat1111
Paint coat2222
External paintAce weather proofApex weather proofApex weather proofApex ultima weather proof
Enamal paintingβœ”βœ”βœ”βœ”
Primer coat1111
Paint coat2222
Enamal paintSyntetic enamalSyntetic enamalPremium enamalHigh end PU enamal
BrandAsian/Berger/DuluxAsian/Berger/DuluxAsian/Berger/DuluxAsian/Berger/Dulux
ELEVATION
Percentage considered in packageβ€”0.50%0.75%2.00%
INTERIOR DESIGN
Concept design 2D and 3Dβ€”β€”β€”βœ”
Site measurementsβ€”β€”β€”βœ”
Working drawingsβ€”β€”β€”βœ”
Material selectionβ€”β€”β€”βœ”
GOVERNMENT LIASION ASSISTANCE
Construction Plan Sanctionβœ”βœ”βœ”βœ”
Temporary Electricity connectionβœ”βœ”βœ”βœ”
Permanent electrical connectionβœ”βœ”βœ”βœ”
Water connectionβœ”βœ”βœ”βœ”
Sewage connectionβœ”βœ”βœ”βœ”
WARRANTY
Warranty10 years10 years10 years15 years

Terms & Conditions

  • All prices mentioned are inclusive of taxes. Any additional taxes imposed by Central, State, or Local Authorities will be the responsibility of the owner.
  • The final cost will be based on the actual built-up area, calculated from the actual slab area constructed.
  • Rates are based on the scope outlined in the agreement. Any changes to the scope will incur additional costs. The minimum area of construction considered for calculation is 3000 sqft, reduction in area would change the cost.
  • All liaisoning fees and charges to relevant authorities must be paid by the client.
  • The foundation will follow the structural drawings and will be based on standard Soil Bearing Capacity (SBC) of 180KN/MΒ². Isolated footings are valid only for dimensions of 5x5x5 ft.
  • The owner is responsible for providing water and electricity during the construction period.
  • The cost assumes standard earth excavation. If any concrete, stone, rock, or other obstacles are encountered during excavation that require additional work, extra charges will apply.
  • Any work not included in the initial quote will be billed separately at the listed prices, with applicable service charges.
  • All payments for statutory charges such as those to BBMP, BESCOM, BWSSB, including any deposits and bills, are the responsibility of the owner.
  • Any unforeseen issues with neighbours including soil/compound sliding, or statutory bodies must be handled by the owner.
  • The site and road levels are assumed to be the same for cost calculations. If there is any difference in levels that requires backfilling, this will incur additional costs.
  • Adequate space for a labour shed and storage must be provided by the owner within 50 feet of the project site. Small quantity procurement will attract additional costs.
  • The pricing assumes the use of base cost for raw materials and a minimum total built-up area of 3000 sqft.
  • Payments must be made as per the agreed-upon schedule in the contract.
  • If the client chooses to withdraw after the design phase is completed, a charge of Rs.100/- per sqft will apply.
  • The building structure comes with a 10-year warranty. However, age-related cracks are not covered, and the warranty will be void if any alterations are made to the structure.
  • The quotation is valid for 30 days from the date of booking. If the agreement is not signed within this period, the quote will be considered null and void.
  • Any details or services not specified in the package are not included in the scope of construction.
  • Any and all changes in the design post agreement will extend the timeline as well as increase the cost. The changes would be accommodated with additional service, design, labour and material charges.
  • The total cost of construction is arrived assuming the construction timeline which is directly related to the timely payments.
  • Material and labour cost escalation beyond 5% is borne by the client.